SR 8 (I-10) / SR 200 (US 301) Interchange Operational Improvements

Project Write-up

This $107M Interchange reconstruction project includes the demolition of four existing bridges and the construction of eight new FIB bridges in their place. In addition, the project includes the construction of new ramps, ramp realignments, and roadway widening of I-10 from four lanes to six lanes. The project features a large CSX railroad yard within the interchange and bridge reconstruction limits providing a unique coordination opportunity. The project also includes two-phase mechanically stabilized earth (MSE) walls, critical sheet pile walls, roadway widening, asphalt resurfacing, box culvert extensions, jack and bore pipe installation, overhead sign structures, high mast lighting, conventional highway lighting, signalization, contamination assessment and remediation (CAR), 3,000 LF of 12” water main installation and 800 LF of 6” force main installation.