top of page
Project Write-up
This $1.38M Stormwater Pump Replacement project. This project is located adjacent to the Myrtle Ave. tunnel, beneath I-95 and consists of drainage construction, pipe lining, pump installation, demolition, concrete construction, earthwork, erosion control, pollution abatement, electrical, utility, and site improvements such as gravel, sod, fencing, and other incidental construction
bottom of page