This $5.8M bridge reconstruction project includes the complete demolition of the existing bridge and construction of a new 243’ two-lane concrete bridge with 7 total spans and 24” diameter steel pipe piles. The project also features a temporary bridge detour using an ACROW bridge, roadway reconstruction and resurfacing, drainage improvements, wetland impacts, utility adjustments, signage and pavement markings