top of page
This water main replacement project through JEA’s continuing CEI contract consists of 7,800 LF of a new 12” PVC water main along Ponte Vedra Blvd. from Corona Road to Pablo Road. The project also includes the abandonment of several thousand linear feet of various sizes of water main, the installation of service connections, and fire hydrants. The project requires extensive maintenance of traffic with flagging operations and detour routes, coordination with St. Johns County and local businesses/residents, pressure testing and flushing of the new lines, service connections, and coordination of outages for final mainline connections. The project also includes the full roadway reconstruction of Ponte Vedra Blvd.
bottom of page