SR 23 SOUTH FIRST COAST EXPRESSWAY

FIN: 422938-5-52-01

Client: Florida Department of Transportation

County: Duval

Cost: $179 Million

Reference: Taylor Byrd, P.E., Project Manager, 386.832.7153
taylor.byrd@dot.state.fl.us

A new multi-lane, limited access toll road that will run East of CR 209 to North of SR 16. The project consists of approximately 9.7 miles of newly constructed roadway, a new drainage system, storm water ponds, traffic signals, lighting, highway signing, guardrail, box culverts,15 new bridges and MSE walls. The project further consists of an ITS trunk line spanning the length of the roadway, two new facilities featuring overhead gantries with electric tolling and other incidental construction. 