This FDOT District 3 project constructed a new two-lane bridge utilizing 24” pipe piles and 15” Florida Slab Beams over Ward Creek. The project also included the installation of a temporary on-site diversion bridge, demolition of the existing bridge on CR 259 over Ward Creek, shoulder treatment, pile driving, base work, guardrail installation, updated roadway signage, pavement markings and utility work. VIA was a subconsultant to AECOM Technical Services on this project.