This project consisted of reconstructing 3.5 miles of the existing 2-lane roadway into a 4-lane roadway. The project included 800’ bridge widening utilizing Florida Slab Beams, 16,700 tons of asphalt, 15,600 LF of drainage, 11,400 LF water main and sewer improvements, 12,000 LF of fiber optic cable, signalization, challenging MOT and public relations.