WILLOW BRANCH PHASE 2 CANAL
Contract No. 10751
Client: City of Jacksonville
County: Duval
Cost: $831 K
Reference: : Daryl Weinstein Project Manager 904.255.8925
This project consisted of removing existing deteriorating retaining walls and construction of new precast and cast in place retaining wall systems between St. Johns Avenue and Riverside Avenue. The project also included the installation of approximately 300 LF of 66” storm drain pipe with cast in place structures to eliminate a portion of the canal. Project required the managing of Willow Branch Creek fl ow as well as enhanced erosion control measures to the close proximity to the St. Johns River. Additional project elements included rubble riprap and concrete removal and installation of