This low impact drainage project consisted of site preparation, traffic control, installation of new drainage structures and storm pipes, ditch regrading, new pond, utility relocation and coordination, removal and replacement of existing appurtenances, pavement restoration, and sodding as indicated in the plans. This project also included a new 8” JEA water main to replace an existing 4” asbestos lined pipe