top of page

SHILOH MILL BLVD. SIGNAL ITS IMPROVEMENTS

Contract No.: 26533-62

Client: City of Jacksonville

County: Duval

Cost: $2 Million

Reference: Jack Gabriel, Project Manager, 904.255.8746
jackg@coj.net

This project included the installation of a new mast arm traffic signal at Shiloh Mill Boulevard and Gate Parkway as well as 6 miles of directional bore and fiber optic interconnect cable. The project scope included drilled shafts, mast arm traffic signals, directional bore conduits, traffic control cabinets, pull boxes and 48 pair fiber optic cable. Project required close coordination with FDOT and City Traffic Operations. 

bottom of page