top of page
This roundabout project included demolition and removal of existing asphalt pavement, traffic signal, concrete sidewalks, pipes, trees, curb, gutters and drainage structures. This project consisted of conversion of existing inlet tops to manhole tops, construction of a new asphalt pavement, stamped concrete pavement, drainage structures and pipes, curb, gutters, handicapped ramps, decorative lighting, landscaping and irrigation.
bottom of page