SR 200 (US 301) RESURFACING
FIM; 430352-2-52-01
Client: Florida Department of Transportation
County: Clay
Cost: $6.2 Million
Reference: Joaquin Olivella, Project Manager, 352.381.4214
joaquin.olivella@dot.state.fl.us
This project included 5.5 miles of construction and consisted of milling and resurfacing with over 50,000 tons of asphalt, deep milling, median inlet drainage modifications, signalization, Wireless Magnetometer Vehicular Traffic Detection, new highway signing, rubble rip rap, ditch pavement, over 51,000 SY of performance turf, striping and other incidental construction on SR 200 (US 301).