top of page
This bridge replacement project through the City’s continuing CEI contract consisted of removing the existing 30 FT double span concrete bridge on Lakeside Drive and replacing it with a triple barrel box culvert on stinger piling, reconstruction of the Lakeside Drive and Wabash Avenue intersection and sidewalk construction between US 17 and Herschel Street. Project also included roadway removal and reconstruction, drainage removal and construction, milling and resurfacing, water main construction, lighting construction, maintenance of traffic, dewatering, erosion control, utility adjustments, and ADA ramps.
bottom of page