top of page
This project consisted of 2,200 LF of a new 60“ storm drain system including a new outfall to the Ortega River. The project also included 5,000 LF of new connector drainage piping, nutrient separating baffle boxes, approximately 2,500 LF of new water main, milling and resurfacing, pavement markings, sidewalk, curb and gutter, and driveway construction. VIA was a subconsultant to Meskel & Associates Engineering on this project.
bottom of page